BATHROOM RENOVATIONS

Bathrooms detailed for waterproofing and daily use

Bathroom work depends on correct waterproofing, ventilation and service routing. Layout, tile and fittings are selected together so falls, joints and access panels work properly.

Explore the detail
bathroom-renovations--11

A CLEAR SCOPE

Scope and preparation

The scope covers the shower or bath, sanitaryware, tiling, waterproofing and ventilation.

Pipework and falls are checked before the room is stripped out.

bathroom-renovations--15

Bathroom Renovations services

Waterproofing and substrates

Use a compatible tanking system, reinforce wet-area joints and allow curing before tiles are fixed.

Sanitaryware and storage

Choose vanity, WC and shower sizes that suit the room, with storage and clearances confirmed on plan.

Tile, ventilation and finish

Set out tiles around fittings, seal movement joints and commission extraction to control moisture.

bathroom-renovations--21

Make informed decisions

Illustrative references help discuss materials and finishes. Confirm dimensions and conditions at the property.

Planning and preparation

Confirm shower and bath positions, drainage falls, extract ventilation and access to pipework. Check the substrate and waterproofing system before tiling.

Confirm the waterproofing system and curing time before tiling.

Agree tile set-out, access panels and extractor position before first fix.

Keep the transition at the bathroom doorway under review and check fixing provisions for screens, rails and accessories against confirmed dimensions and product information.

YOUR NEXT STEP

Next steps

Bring the room dimensions, preferred fittings and any damp or ventilation concerns.

Discuss this project