Frequently asked questions

Frequently asked questions

Answers to common questions about planning, pricing and managing construction work.

Plan the work

What should I bring to an initial consultation?

Bring the address, approximate room sizes, photographs and a list of the problems you want to solve. Any existing drawings, surveys or estimates are useful. A short description of your timing and budget range helps identify the next step.

What makes two estimates comparable?

Two estimates are comparable when they describe the same scope, materials, quantities and exclusions. Ask each contractor to list what is included, what is provisional and what has been left out, then compare those lists before comparing totals.

How should I set a renovation budget?

Start with the work required to make the property safe and functional, then add improvements in priority order. Include a contingency for hidden conditions and for decisions made after work starts.

When should we discuss permits?

Permits should be discussed before design is finalised. Structural changes, additions, some services and changes of use may require approval; the local authority or a qualified designer can confirm what applies.

What determines a practical start date?

A practical start date depends on approvals, material lead times, access and the availability of trades. Working backwards from the required completion date shows where decisions must be made.

Manage the work

How should a change be recorded?

Record a change in writing with its reason, cost, effect on the programme and who approved it. Update the drawings, scope and payment schedule so the site team works from one version.

What should a progress update include?

A useful update covers work completed since the last report, work planned next, open decisions, delays and any cost changes. Photographs and a short list of actions keep everyone aligned.

What happens if demolition reveals a hidden problem?

Work should pause while the condition is inspected and priced. Agree whether the item is additional, a replacement of existing work or a variation, and record the instruction before proceeding.

How can I prepare the site before work starts?

Clear access and storage areas, protect retained finishes and remove valuables. Confirm parking, waste collection, services and working hours before the first day.

What should we review at handover?

Review the completed work against the agreed scope, test services and check finishes, doors and fittings. Record outstanding items, agree a completion date and collect warranties and instructions.

Additional questions

What should a written scope of work include?

A written scope lists the rooms and areas, work included, materials and products, exclusions, provisional sums, access arrangements, programme and payment stages. Drawings and specifications should be referenced.

How can I compare two construction quotes?

Compare the scope line by line rather than the total alone. Check quantities, product specifications, exclusions, provisional sums, waste removal and what happens if hidden work is found.

Who confirms whether a permit is needed?

The owner is responsible for confirming approvals, with help from the contractor or designer. The local authority can confirm whether the specific work needs a permit before it starts.

Discuss your project

Bring your questions and the property details to the first conversation.